In 2011, 91¶¶Òõwas the successful bidder on a $392K project to renovate a portion of existing space into a battery storage and charging area. Proving ourselves a reliable partner, 91¶¶Òõhas grown that initial project into work at each of the five manufacturing plants for Chrysler in the Kokomo, IN, area. In the past 12 years, our team has collaborated on over $120M of work and over 2,200 projects for Chrysler. These projects have ranged in size from $500 to $9.0M and have been delivered using traditional and collaborative delivery methods, including general contracting, subcontracting, construction management at risk and design-build. 91¶¶Òõhas self-performed specific scopes of this work, fielding a crew of approximately 25 craftsmen at any given time and routinely providing demolition, excavation, concrete, and rough carpentry in the active manufacturing facilities. Notable projects have included the Die Storage Building Addition, Kokomo Casting Plant Cooling Tower Replacement, Caseline 12 equipment demolition, Caseline 14 equipment and concrete demolition, numerous slab replacement projects, new conveyor pits and trenches for production, and the Kokomo Engine Plant expansion.